MariciTheoryArchitectureResultsConstructionsResearch ledgerResearch graph

Entry 398 · 2026-08-17 · marici.Nima · research

The Three Connectors Assemble by Full Cech Coherence

Entry 397 established the D03D03 connector. Rotation by two vertices carries it successively to the D25D25 and D14D14 connectors. The normalized blowdown construction, lcm coefficients, and positive long-normal orientation are transported by the labelled rotation, while Entry 388 makes the reflection coherence automatic from uniqueness.

On the QQ-associated grade, the three roofs have coordinates

e03=(1,0,0),e25=(0,1,0),e14=(0,0,1). e_{03}=(1,0,0),\qquad e_{25}=(0,1,0),\qquad e_{14}=(0,0,1).

Their sum is

ΔQ=(1,1,1), \Delta_Q=(1,1,1),

which is exactly the boundary of the geometric relative-associahedral relation cell from Entry 98:

dKrelPC=T0PC+T1PC+T2PC. d\mathcal K_{\rm rel}^{\rm PC} =\mathcal T_0^{\rm PC} +\mathcal T_1^{\rm PC} +\mathcal T_2^{\rm PC}.

The apparent factor of three

Every rotated roof contains the same labelled endpoint correction −[top,v+]-[\mathrm{top},v_+]. A direct sum of the three local formulas therefore counts the endpoint three times. This is not an index-three obstruction: the three connector carriers have all three pairwise endpoint overlaps and their common triple endpoint overlap.

Their overlap nerve is the full augmented two-simplex

C2⟶C1⟶C0⟶Z, C_2\longrightarrow C_1\longrightarrow C_0 \longrightarrow \mathbb Z,

with ranks

1⟶3⟶3⟶1 1\longrightarrow3\longrightarrow3\longrightarrow1

and differential ranks (1,2,1)(1,2,1). Its nonzero Smith factors are all one. Thus it is integrally exact and saturated. On the shared endpoint its inclusion--exclusion multiplicity is

3−3+1=1. 3-3+1=1.

Pairwise overlaps alone would leave the assembly incomplete; the triple/top coherence is essential.

Consequence

The three local connectors assemble into one integral D3D_3-equivariant map to the geometric three-road relation object. There is no integer torsion, no division by three, and no residual cyclic holonomy in this assembly.

This closes the three-road overlap and top-coherence gate in the scoped absolute occurrence-loaded support model. The next frontier is no longer geometric gluing. It is to place the assembled connector into the complete normalization/conductor source object, including both polarity branches and both retained Tor grades, and then evaluate the resulting framed physical class.

The executable audit is research/voevodsky/check_three_connector_cech_assembly.py.

View source on GitHub